System Constellation

Interactive view of all ETHRAEON surfaces and their relationships

ethraeon.ai docs canon investor ali control dashboard faith rylin kyrios aurix APEX CORE STAKEHOLDER ENGINE

Surface Registry

All 222 registered surfaces with status and lane classification

ethraeon.ai 200 OK
Lane: APEX/THRESHOLD Purpose: Primary public gateway
Lane: CANON (immutable) Purpose: Source of truth repository
Lane: DOCS HUB Purpose: Technical documentation
Lane: INVESTOR Purpose: Tier-0 investor materials
Lane: STAKEHOLDER KIT Purpose: ALI Protocol stakeholder
Lane: SOVEREIGN GUI Purpose: Architect console

Verification Panel

System integrity checks: HTTP, DNS, SSL, hash verification

HTTP Status (200)
220 / 222
TLS/SSL Grade
A+
DNS Resolution
VERIFIED
CANON Integrity
LOCKED
HSTS Status
ENABLED
Redirect Check
1 (intentional)
SHA
CANON SHA256SUMS
/var/www/canon/CANON_SHA256SUMS_COMPLETE.txt
View
CERT
CANON Lock Certificate
/var/www/canon/CANON_LOCK_CERTIFICATE.md
View

Artifact Browser

CANON-locked documents, certificates, and verification artifacts

MD
SOURCE_OF_TRUTH.md
/var/www/canon/
View
MD
SURFACE_REGISTRY.md
/var/www/canon/
View
JSON
SYSTEM_MAP.json
/var/www/canon/
View
MD
LANE_STRUCTURE.md
/var/www/canon/
View
CERT
R1_COMPLETION_CERTIFICATE.md
/var/www/canon/
View
CERT
R2_COMPLETION_CERTIFICATE.md
/var/www/canon/
View
MD
ETHICS_INFRASTRUCTURE.md
/var/www/canon/
View

System Logs

Recent operations and deployment events

[2026-01-13 03:00] FULL METAL SOVEREIGN phase initiated
[2026-01-13 02:55] F1 Pre-flight: 222 surfaces verified
[2026-01-13 02:50] F2 Truth rectification: ALI UKR page updated
[2026-01-13 02:45] F3 Manifest normalization: Investor manifest created
[2026-01-13 02:40] F4 Video check: 0 MP4 assets (none required)
[2026-01-13 02:35] Control GUI v4.0 deployed
[2026-01-13 01:57] Engine surfaces created: faith, rylin, kyrios, aurix
[2026-01-13 01:16] ALI surface rebuilt with constellation design
[2026-01-12 23:00] EUDS compliance: 36 emoji violations fixed
[2026-01-12 22:30] EUDS compliance: 17 em-dash violations fixed
[2026-01-12 22:00] Link integrity: 33 broken links repaired
[2026-01-12 17:33] Control v3.0 deployed
[2026-01-12 12:00] PSG-4 completion certificate issued
[2026-01-12 00:00] Date lock: 2026-01-12 enforced across all surfaces